401 N. Broad Street – Energy Infrastructure Upgrade
Philadelphia, PA

Project Description:

TNW is currently installing 8 megawatts (MW) of on-site power generation with the capability to expand to 24 MW. The mission critical project includes installation of power distribution systems, IC engines with SCR emission controls, and support operations for the 1,300,000 SF data center.

The first phase of the upgrade – completed and commissioned six (6) weeks ahead of schedule – included installation of electrical substation & switchgear, power distribution systems and IC engine generators with SCR emission controls. The second phase consisted of the replacement of (2) existing freight elevators (20-ft x 8-ft cabs) within an 11-story building including all elevator machine room equipment, controls, doors & operators, HVAC, electrical, fire protection and structural reinforcing and modifications.

 

Owner:

Netrality Properties

Architect:

Bala Consulting